CHILLER & PARAMIX INSTALLATION ETHIOPIA

Ethiopia
Completed: 2025
Chiller & Paramix Installation

PROJECT OVERVIEW

Right First Time Engineering was engaged by Awash Wine to design, supply, install, and commission a chiller and paramix system at their production facility in Ethiopia. This critical project demanded precise engineering to ensure optimal temperature control and consistent product blending across the production line.

The scope encompassed the full mechanical and electrical installation of industrial chiller units alongside paramix blending systems, integrated with the existing production infrastructure. Our team ensured seamless connectivity between all components, delivering a turnkey solution that enhanced production efficiency and product quality.

KEY DELIVERABLES:

  • Supply and installation of industrial chiller units for precise temperature regulation.
  • Installation and commissioning of paramix blending systems.
  • Full mechanical piping and electrical wiring integration.
  • Integration with existing plant control and monitoring systems.
  • On-site training for plant operators on system operation and maintenance.

Project Details

Client Awash Wine
Sector Wine & Beverage
Duration 6 Months
Value Confidential