Project Hero
Back to Projects

FILLER INSTALLATION AT SEYCHELLES BREWERY

Seychelles
Completed: 2025
Filler Installation

PROJECT OVERVIEW

Right First Time Engineering was contracted to install a new filler at Seychelles Brewery. This project involved the complete mechanical and electrical installation of modern filling equipment designed to increase the brewery's production throughput while maintaining the highest quality and hygiene standards.

Our engineering team managed the entire project lifecycle from equipment positioning and alignment through to full commissioning and handover. The new filler was seamlessly integrated with the existing bottling line infrastructure, minimizing downtime and ensuring a smooth transition to full-scale production.

KEY DELIVERABLES:

  • Installation and alignment of new high-speed filling equipment.
  • Mechanical piping connections and utility integration.
  • Electrical wiring and control panel installation.
  • Integration with existing bottling line conveyor systems.
  • Full commissioning, performance testing, and operator training.

Project Details

Client Seychelles Brewery
Sector Brewing & Beverage
Duration 3 Months
Value Confidential
Inquire About Similar

PROJECT GALLERY