Right First Time Engineering was contracted by Nairobi bottlers limited to install and commission a state-of-the-art hot fill line at their production facility. This project required precision engineering to ensure seamless integration with existing production systems while meeting the highest standards of food safety and operational efficiency.
The installation encompassed the full mechanical and electrical setup of hot filling equipment, including high-temperature filling heads, pasteurization tunnels, and automated capping systems. Our team delivered a turnkey solution that significantly boosted the facility's hot-fill production capacity.