KEGLINE INSTALLATION ETHIOPIA

Ethiopia
Completed: 2026
Kegline Installation

PROJECT OVERVIEW

This project involved the comprehensive installation and commissioning of a high-capacity kegging line in Ethiopia. Our engineering team managed the entire lifecycle of the project, ensuring that every component met the rigorous standards required for modern brewing operations.

The scope included the installation of advanced keg washers and fillers, integration of sophisticated conveyor systems, and the setup of automated control units. We focused on maximizing throughput while maintaining the highest levels of hygiene and safety.

KEY DELIVERABLES:

  • Installation of high-speed keg washing and filling units.
  • Integration of automated conveyor systems for seamless keg movement.
  • Setup of PLC-based control systems for real-time monitoring and diagnostics.
  • Custom stainless steel piping and manifold fabrication.
  • On-site training for local technical staff on operation and maintenance.

Project Details

Client Heineken brewery
Sector Brewing & Beverage
Duration 8 Months
Value Confidential